Herunterladen Diese Seite drucken

Sartorius Stedim Biotech Flexsafe 3D Bag For Palletank Benutzerhandbuch Seite 6

100l, 200l and 500l

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 31
6
Flexsafe
®
3D System 100L, 200L, 500L Instructions for Use
3. Flexsafe
3D System 100L, 200L, 500L
®
Instructions for Use
3.1 Preparation of the Palletank
1. If you use:
the Palletank
for In-process Fluid Handling, open the hinged front doors by
®
y
y
removing the four locking systems (see Fig. 6)
the Palletank
for Shipping, please refer to the Palletank
®
y
y
Instructions for Use delivered with the Palletank
Fig. 6: Preparation of the Palletank
®
2. Before installing the Flexsafe
surfaces of the Palletank
damage the bag surface.
3. Open the bottom gate(s) (see Fig. 7):
− Check that the Palletank
follow this instruction may result in product loss).
− Unlatch the retaining clip from the fastening point on the jaw of the gate.
− Grasp the mobile side of the gate and swing the bottom gate completely open.
Fig. 7: Bottom gate closed | Bottom gate opened
®
®
3D Bag in the Palletank
®
are dry, smooth and free of any particles that might
®
does not contain a filled Flexsafe
®
for Shipping
®
, check that the internal
®
3D Bag (failure to
®
1. Swinging portion of
bottom gate
2. Fixed portion of
bottom gate
3. Retaining clip
fastening point
4. Retaining clip

Werbung

loading