Herunterladen Diese Seite drucken

ABB FXE4000 Inbetriebnahmeanleitung Seite 41

Vorschau ausblenden Andere Handbücher für FXE4000:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Corrective maintenance work may only be performed by trained personnel.
Depressurize the device and adjoining lines or containers before removing the device.
Check whether hazardous materials are used as materials to be measured before opening
the device. Residual amounts of hazardous material may still be present in the device and
could escape when the device is opened.
As far as provided in the scope of the operational responsibility, check the following items
through a regular inspection:
2
Transport
2.1
Inspection
Check the devices for possible damage that may have occurred from improper transport.
Damages in transit must be recorded on the transport documents. All claims for damages must
be claimed without delay against the shipper and before the installation.
2.2
General information on transport
Observe the following when transporting the device to the measurement site:
The center of gravity may not be in the center of the device.
The protective pates or dust caps mounted at the process connections of devices equipped
with PTFE/PFA may only be removed before installation. To prevent possible leakage, make
sure that the liner is not cut or damaged.
Flanged units may not be lifted by the transmitter housing or terminal box.
D184B133U02
the pressure-carrying walls / lining of the pressure device
the measurement-related function
the leak tightness
the wear (corrosion)
FXE4000 (COPA-XE/MAG-XE)
Transport
EN - 7