Installation
5
Installation
5.1
Scope of Delivery
Item
Device
Pan support
Frame draft shield
Power supply unit with country-specific
AC adapters
Operating Instructions
Shock absorber
5.2
Selecting an Installation Site
Procedure
Make sure that the following conditions are met at
t
the installation site:
Condition
Features
Ambient
— Suitability tested (ambient
conditions
conditions see
ChapterKapitel 15.1,
Seite 41)
Setup surface
— Stable, even surface with little
vibration
— Sufficient space for the device
(device space requirements see
ChapterKapitel „15.9 Device
Dimensions", Seite 43).
— Sufficient load bearing capacity
for the device (device weight
see ChapterKapitel „15.10
Metrological Data",
Seite 44).
Access to
Convenient and safe
parts relevant
to operation
16
Entris
BCE Operating Instructions
®
5.3
Procedure
Unpack the device.
t
If the device is stored temporarily: Observe the
t
storage information (see ChapterKapitel 13.1,
Quantity
Seite 39).
1
Keep all parts of the original packaging, e.g. to return
t
the device.
1
1
5.4
1
Procedure
1
4
5.5
Procedure
5.6
When a cold device is brought into a warm environment:
The temperature difference can lead to condensation
from humidity in the device (moisture formation).
Moisture in the device can lead to malfunctions.
Procedure
Allow the device to acclimatize for approx. 2 hours at
t
the installation site. The device must be
disconnected from the power supply beforehand.
Unpacking
Removing the Transport Lock
Remove the transport
t
1
locks (1) and retain them
for later use.
Assembling the Device
Place the frame draft
t
3
shield (1) on the balance.
Attach the shock
2
t
absorbers (2).
1
Place the weighing
t
pan (3) on top.
Acclimatizing the Device