Herunterladen Inhalt Inhalt Diese Seite drucken

VATECH A9 Handbuch Seite 49

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 157
Align the Ear Rods into the patient's ears properly so that the head does not
6.
move during the operation. Moreover, aligning the Nasal Positioner with the
patient's nasion by adjusting its height.
7.
Align horizontally, so the patient's Frankfurt Line is parallel with the floor.
8.
Direct the patient to swallow first before closing the mouth and to remain in
his/her current position until image acquisition is completed.
9.
Click the READY button. The x-ray exposure has not started yet.
10. Now go to 4.3 X-ray Exposure to start the exposure.
vatech A9 (PHT-30CSS) User Manual
4. Acquiring CEPH Images (Optional)
Nasion
43

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pht-30css

Inhaltsverzeichnis