Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Endress+Hauser t-mass I 300-digital Einbauanleitung

Hot tap
Vorschau ausblenden Andere Handbücher für t-mass I 300-digital:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8

Installation

8.1
Installing the hot tap process connection
DANGER
L
Load is too high!
Damage to pipe.
If the pipe walls are thin, support brackets and a baseplate must be welded on for
reinforcement to distribute the load. Otherwise, the mounting can be so unstable that the
pipe is damaged.
When installing the weld-in nipples, always comply with the safety and mounting
instructions in the Operating Instructions.
1 →
1" NPT
Drill or cut the hole to the correct diameter.
3
1" NPT
G 1"
Or fit a retrofit adapter.
Material (process connection): 1.4404 as per EN 10272 and 316/316L as per A479
Endress+Hauser
(Ø1.22in
1" NPT
Ø31.0mm
± 0.5 mm
± 0.019 in)
2 →
90°
90°
± 3 °
Align the process connection
correctly and weld it onto the
pipe.
EA01288D
± 3°
9

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

T-mass i 500-digital

Inhaltsverzeichnis