Herunterladen Inhalt Inhalt Diese Seite drucken

Periodic Checks - DKL CHAIRS D2-SOLO Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für D2-SOLO:
Inhaltsverzeichnis

Werbung

PErIOdIc cHEcKS

 Check the absence of space between joint components of the arms (yearly)
 Check readability of data on the information plate (yearly)
 Power safety check: (every two years)
1. Rigidity
2. Dispersion
 Light checks (every five years or 10,000 hours of function)
1. Maximum lighting intensity >35000 lux
2. CRI decay: <20% for data on the information plate.
3. Expected value of Blue light on spectrum emitted, measured in w/m2: <100.
InSTALLInG THE cEILInG LIGHT FIXTUrE
Before installing the lamp on a structure (e.g. ceiling), calculate the overall load of the
system to be installed by adding the weight of the system to the maximum load that can
be applied to the lamp. Then, ascertain that the chosen structure and fixing elements are
suitable for bearing the resulting load multiplied by a safety factor K8.
Also ascertain that fixing elements are suitable for ceiling materials (e.g. concrete, stone,
solid brick, hollow brick).
For ceiling-mounted FARO light fixtures designed to hold 2 lamps, calculate the load as
specified below:
- Alya lamp without transformer and complete with arm and hinge joint:
- Column for ceiling-mounting, length 1700 mm:
- Ceiling lamp with 2 transformers for application of 2 lamps:
- Load applicable to the lamp:
- Total load for 2 lamps: 6X2 + 8 + 8 + 35X2 =
Load with safety coefficient 8: 98 kg X 8 = 784 kg (7.7 kN)
SuPPlIED
n° 5 - Expansion bolts (ideal for concrete and natural stone)
6 kg
8 kg
8 kg
35 kg
98 kg
19 19

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

D2-solo-s

Inhaltsverzeichnis