Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Connection; Control Cabinet Installation; Emc-Conform Installation - KEB COMBIVERT F5 SERVO Installationsanleitung

Vorschau ausblenden Andere Handbücher für COMBIVERT F5 SERVO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Connection

3.
Installation and Connection
3.1

Control cabinet installation

Protective system (EN 60529):
Operation temperature:
Storage temperature:
max. heat sink temperature:
Size 05/230 V and 07-09/400 V
Size 07/230 V
Climatic category (EN 60721-3-3):
Environment (IEC 664-1):
Vibration/Jolt according to: German. Lloyd; EN50155
The flat-rear design requires cooling measures by the
machine builder. This can be in the best case no further
measure at all (e.g. at cyclic operation with down times)
up to the dissipation of the entire, indicated heat loss at
rated operation.
3.2

EMC-conform Installation

• Always apply the shielding of motor and
control cables over a large contact surface on
both sides.
• Distance between control and power cables at
least 10...20 cm (4...8 inch).
• Lay motor and power cable separately.
• If it cannot be avoided, cross control and
power cables in a right angle.
• Install all cables as close as possible to the
mounting plate - ideal in a metal cable duct.
• Mount COMBIVERT well conducting with the
mounting plate. Remove the paint before-
hand.
You can find further instructions regarding the
EMC-conform wiring in the Internet at KEB.
Downloaded from
www.Manualslib.com
Protect the COMBIVERT against aggressive
gases and aerosols !
manuals search engine
IP20
-10...45 °C (14...113 °F)
-25...70 °C (-13...158 °F)
90 °C (194 °F)
82 °C (180 °F)
3K3
Pollution degree 2
Installation position and min.
distances
START
START
ENTER
FUNC.
ENTER
FUNC.
F/R
SPEED
F/R
SPEED
STOP
STOP
30 mm
1 inch
ANTRIEBSTECHNIK
ANTRIEBSTECHNIK
GB - 11

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis