Herunterladen Inhalt Inhalt Diese Seite drucken

Carrying Out Initialisation; Maintenance Interval - Kessel Staufix FKA Einbau- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5.3

Carrying out initialisation

During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|

|Maintenance interval|

Language
► Press OK.
► Use the cursor keys to select the language and confirm
with OK.
|Date/Time|
Menu
appears.
Date / Time
► Set the respective flashing figure in date and time and
confirm with OK.
|Product type|
Menu
Product type
► Select product type and confirm with OK.
The "redundant control unit" setting must be selected if
the control unit is to be used as a redundant control unit.
Otherwise the control units cannot be connected to each
other. Follow instructions enclosed with the hybrid lifting
plant.
|
Maintenance interval|
menu
016-003
appears.
appears.
41 / 148

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis