Herunterladen Inhalt Inhalt Diese Seite drucken

Carrying Out Initialisation - Kessel SG 400 V Mono Original Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
5.2

Carrying out initialisation

During initialisation, the following input is expected:
• |Language|
• |Date / Time|
• |Product type|
• |System variant|
• |Capacity|
• |S1 / S3 operation|
• |Maintenance interval|
Language
▶ Press OK
▶ Use the cursor keys to select the language and confirm with OK.
✓ Menu |Date/Time| appears
Date / Time
▶ Set the respective flashing figure in date and time and confirm with OK.
✓ Menu |Product type| appears.
Product type
▶ Select between lifting station and pumping station and confirm with OK.
✓ Menu|System variant| appears.
System variant
▶ Select between the product variants. The product variants can be found in
the respective manufacturer's documents.
✓ Menu|S1 / S3 operation| appears.
010-532_05
All manuals and user guides at all-guides.com
Installation and operating manual
4
[16]
Fig. 16 Pos.No.
Operating keys
[1]
Scroll up
[2]
Confirm by pressing „OK"
[3]
Scroll down
[4]
Press "Esc" to go back
59

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sg 400 v duo

Inhaltsverzeichnis