Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning; Switch On And Off; Carrying Out Initialisation - Kessel Aqualift Comfort Mono 400V Einbau- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Aqualift Comfort Mono 400V:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5

Initial commissioning

5.1

Switch on and off

Connect the battery
Connect the battery connector(s) (2).
5.1.1
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
✓ Initialisation starts automatically.
52 / 204
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
Switch on
Turn main switch (1) into ON position. After a successful sys-
tem test, the display shows
green LED signals readiness.
If the display does not show initialisation
guage|) the control unit has already been initialised. In this
case, the set parameters must be checked, or reset to the
factory settings
tory settings, the initialisation of the control unit starts auto-
matically.
Please note that the counter for the maintenance interval is
not changed by the resetting to the factory settings.
5.2

Carrying out initialisation

During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|System variant|
|Power rating|
Installation and operating manual
is displayed.
|3.10. Language|
|0 System info|
(|3.10. Lan-
(|3.11
Reset|). After resetting to the fac-
and the
010-532_06

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Aqualift comfort duo 400v

Inhaltsverzeichnis