Herunterladen Inhalt Inhalt Diese Seite drucken

Device Installation - ECOLAB Elados EMP E60 serie Kurz- Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Dosierleitung
4.1.2
Hydraulic Connections - EMP II
10
11
12
13
14
15
1.
Trim the tube to the precise length.
2.
Slide the union nut (pos. 2 and 14) and clamping piece (pos. 3 and 13) over the tube
and attach the tube to the taper up to the stop collar (pos. 4 and 12).
3.
Insert the O-ring (pos. 5 and 11) into the valve groove and tighten the union nut.
4.
For an easy venting of the metering pump, the venting connection (pos. 8) is to be
led back via a separate pipeline (pos. 9) into the metering medium container.
7
6
5
3
2
4
1
1
2
2
3
3
4
4
5
5
P
6
7
6
7
8
9
10
11
12
13
8
14
S
9
15
P
S
1
Dosing hose
2
Union nut
3
Crimp ring
4
Angled connection pipe
5
Crimp ring
6
Connector
7
Union nut
n
Cut off the metering hose or pipe straight.
n
Push over the union nut (pos. 2) and crimping ring
1
(pos. 3).
n
Attach the hose or the pipe onto the connection
piece (pos. 4) until the stop motion and screw it up
by hand.
n
Tighten union nut (pos. 7) by hand.
n
Adjust angled position by loosening and screwing
down the nut again (pos.1).
Metering tube
Union nut
Clamping piece
Tapered part
Pressure-side O-ring (metering)
Pressure valve
Vent screw
Vent connection
Vent hose (not supplied)
Suction valve
Suction-side O-ring
Tapered part
Clamping part
Clamping piece
Union nut
Metering hose
Suction side
11

Device installation

MAN033535 Rev. 06-04.2020

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis