Herunterladen Inhalt Inhalt Diese Seite drucken

6.3.1.2.4 Hose Connection With Weld-On Joint - ECOLAB EcoPro Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.3.1.2.4 Hose connection with weld-on joint

1
2
3
4
5
Fig. 13: Pipe and hose connection with female coupling
1
Weld-on joint
2
Pipe or hose
3
Swivel nut
4
O-Ring
1.
Weld the weld-on connection (1) to the hose connection.
2.
Place an O-ring (pos. 4) in the groove of the suction or pressure valve (pos. 5).
3.
Tighten the union nut (3) (detail B1).
A1
B1
43
Mounting and installation
5
Suction valve, pressure valve
A1 Pipe or Hose in the welded-on connection
B1 Valve connection: Target state after assembly
417102264 Rev. 6-12.2019

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis