Herunterladen Diese Seite drucken

Novoferm iso70-1 serie Montage-, Bedienungs- Und Wartungsanleitung Seite 12

Sektionaltore mit winkelzarge
Vorschau ausblenden Andere Handbücher für iso70-1 serie:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
GB
GB
protective cover for rope drum 106 with S10
Guide cable 104 (longer version; located in HL frame
box) through deflection pulley bracket 101
, pull & clamp to drum of HL torsion spring 35
j]
, feed down behind rollers 56
[2.20 b]
into bottom cable mount
57
/57
R
L
tension cable 104 through the groove of the cable
drum
. Measure 1 m of cable 104 from the
[2.20 b]
drum and shorten the excess length with a suitable
cutting tool (wire rope cutter, power cutter)
Pull cable back, lock in cable drum with grub screw
and rewind onto drum
(14c) Position cable with cable eye stiffener 104 and
plastic bushing 59 on the bolt 57 and secure with
splint 60 [
1.45 c
with 4x S3 at the bottom section
Insert the lower roller 50 together with 2x S5 into
bottom cable mount 57
Bolt the lower castor 50 with 2x S12 to the bottom
cable mount 57
(15)
Lock section 67 (S) [1.50 ].
(15a) Insert the lock section 67 into the angled frames
1
/1
, secure against falling and attach a universal
R
L
hinge 48 to the right and left of the lock section 67 as
well as rollers 56 with S3.
(15b) Assemble the lock set on the lock section as shown
in the exploded view
outdoor handle + indoor handle (69-78). Insert lock
plate with cover plate from the outside into
rectangular hole on lock section and bolt from the
inside using lock set. Push outdoor handle through
the holes in the lock (crank pointing up) and bolt to
indoor handle from the inside. Caution: Rotating arm
(die cast zinc) must point upwards to the right!
Keep these installation, operating, and maintenance instructions in a safe place during the entire service life of the garage door!
R/
[2.20 a]
. Pull and
[1.45 c]
[2.15
k].
]. Bolt the bottom cable mount 57
.
[1.45 d]
.
[1.40e]
R/L
.
[1.40f]
R/L
.
[1.50 a]
. Lock plate + lock set +
[1.50 b]
.
Garage doors without operators
[2.15 k]
(15c) Bolt the catch79 using S10 to the lock section
101
(15d) Hold the bolt bar 80 to catch 79 and rotating arm and
[2.15
L
/35
R
L
, hook
(15e) Insert bolt bar 80 into rotating arm together with
(16)
Middle section(s) 86 (M) [1.55 ].
.
Using the same procedure as for the bottom and lock
[2.20 d]
sections, insert middle section(s) 86 into angular frames
/1
and fasten with S3 + 48 + 56.
1
R
L
(17)
Top section 87 (K) [1.55 ] [2.20].
(17a) Bolt the top roller block 88 to the top roller holder 90
R/L
(17b) If installing NovoPort, the outer ring on top roller 90
If installing NovoPort, the outer ring on top roller 105 must
be removed on the drive side. Grasp the top roller with your
left hand and insert a screwdriver between the rib and tooth
on the roller. Twist the roller to the right to loosen and
remove the outer ring.
(17c) Insert top section 87 into angular frames 1
(18)
Bolt the bottom section 44 to top section 87 and hinges 48
using S3 (M
Adjusting the rollers:
(19)
(19a) Manual and ceiling pull operation: Pull all rollers
Adjusting the height of the upper roller:
(19b) Manual and NovoPort operation: The centre of the
(19c) Ceiling pull operation: Roller must lie in the upper
(20)
Adjusting the torsion spring [1.60]; [2.20].
(20a) Turn the torsion spring by hand to tension the cable
(20b) Tension the torsion spring:
- 10 -
shorten to correct length, if necessary, using metal
saw or power cutter
.
[1.50c]
catch 79 and use S14 to fasten bolt bar 80 and catch
.
[1.50 c]
using S5 + S12
.
Screw the top roller bracket
[1.55 aa]
88 to the top roller holder105
must be removed on the drive side. Holding the top
roller in your left hand, make 2 indents with a pair of
pliers. Twist the roller to the right to loosen and
remove the outer ring
[1.55ab]
.
[2.20cb]
secure against falling and bolt each top roller block
88 with top roller holder 90 left and right to top
section 87 using S3
[1.55ac]
angular frames 1
/1
, secure against falling and bolt
R
L
each top roller block 88 with top roller holder 105
left and right to top section 87 using S3
=10Nm)
.
[1.50d]
A
away from the door leaf in the direction of the arrows
until the door leaf lies flush against the frame seal
(distance between section edges and grey part of the
frame seal approx. 1 mm). The rollers must turn
easily by hand.
.
[1.55 b]
Novoport: Adjust the rollers on the drive side as
shown in the illustration
[1.55 ba]
roller must dip approx. 5 mm into the moulded end
piece. (Guideline: Lower edge of upper roller holder
must be flush with mark on upper roller block)
corner of the moulded end piece
on the drum and make sure it is positioned correctly.
Tighten coupling screws S11
springs for left and right use may differ in terms of
length and wire diameter.
When tensioning/relaxing the springs, appropriate
personal protective equipment must be worn. The
number of tensioning turns is indicated on the
nameplate.
Tighten torsion spring 35
with both tensioning tubes
R
92 in the direction of the arrow. Always tighten
springs from bottom to top
[1.60 b]
screws S11. Proceed in same
.
[1.50 c]
/
S5 + S12
.
[2.20ca]
R
L
.
/1
,
R
L
.
Insert top section 87 into
/
R
L
.
[2.20c]
.
.
[1.55 ca]
.
[1.55ca]
. Torsion
[1.60 a]
[2.20 e]
. Cinch holder
[2.20 f]

Werbung

loading