Herunterladen Inhalt Inhalt Diese Seite drucken

Lcd Panel - Promise Technology VessRAID 1000f Serie Kurzanleitung

Fc, iscsi, sas
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 48
Task 7: Connecting the Power

LCD Panel

The LCD panel activates approximately 35 seconds after you switch on the
VessRAID's power supply.
At first, the LCD screen displays
System is Initializing
.
When the VessRAID is fully booted and running under normal conditions, the
LCD screen shows the VessRAID model number and IP address, as shown in
Figure 32.
Figure 32.VessRAID optional LCD display
A list of LCD panel functions and instructions for using them is included in the
VessRAID Product Manual on the CD.
This completes the power and start-up. Go to "Task 8: Setting the IP Address" on
page 34.
33

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis