Herunterladen Inhalt Inhalt Diese Seite drucken

Relocating Operating Site Of Adjustment Cord - Auping K2 type 33 Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 51
4.3 Relocating operating site of
adjustment cord
The control ball for your mesh base is
on the right, but it can easily be moved
to the left.
1. Untie the knot A from the cord B
and remove the ball C (see fig. 6).
2. Remove the protective tube D from
the cord guide E and slide the tube
off the cord (see fig. 7).
3. Tie a knot in the end of the cord.
4. Pull on the cord at the other side of
the bed.
5. Untie the knot.
GB8
6. Pull the cord through the protective
tube (first through the eye, then
through the tube).
7. Hook and pull the protective tube
over the cord guide.
8. Push the cord through the smaller
hole in the ball.
9. Tie a knot in the end of the cord.
10.Pull the control ball over the knot.
fig. 6
fig. 7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

K2 type 39

Inhaltsverzeichnis