Herunterladen Inhalt Inhalt Diese Seite drucken

Operating Procedures - Ugolini Quick-Gel Gebrauchsanweisung

Eiscreme-dispenser
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33

5 OPERATING PROCEDURES

ATTENTION
If the power supply cable is damaged, it must be repla-
ced by the manufacturer or by its service centre, or in
any case by similar qualified professionals, in order to
avoid all risk.
IMPORTANT
Before use, clean and sanitise the dispenser according
to the instructions provided herein in chapter 5.3 CLEA-
NING.
IMPORTANT
If the tap assembly has not been installed, the appliance
cannot operate and the display shows the tap assembly
open icon (see figure 1).
This appliance is equipped with an upper tank designed to keep
the ice-cream preparation base refrigerated and a lower cylinder
for the production of the ice cream.
Every time a portion of ice cream is dispensed, the same
quantity of ice cream mixture drops down by the force of gravity
from the upper tank into the lower cylinder.
In order to obtain softer and lighter ice cream, make sure that a
certain quantity of air enters the cylinder together with the
mixture. To this end, the machine is equipped with a purpose-
figure 1
designed two-part mixing pipe. (see figure 2)
For best results, the following steps must be performed in the
order specified:
1 Insert the lower part of the mixing pipe into the purpose-
provided connection slot between the tank and the cylinder,
making sure you direct it in such a way as to insert it fully in its
seat. (see figure 3)
2 Pour the mixture into the upper tank and wait for the
cylinder to fill up. This will occur when no more air bubbles exit
the holes in the mixing pipe. (see figure 4)
3 Insert the upper part of the mixing pipe into the lower one.
15
figure 2
figure 3
figure 4

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Quick-gel

Inhaltsverzeichnis