Herunterladen Diese Seite drucken

Traffic Regulations; Transporting The Swathe On The Roads; Maintenance And Periodical Overhauls; Special Sefety Instructions - SIP STAR 850/26 T Betriebsanleitung

Kreiselschwader
Vorschau ausblenden Andere Handbücher für STAR 850/26 T:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 62
24
1
2
It is forbidden to stay in the working
area of the machine.
It is forbidden to come close to rotating
tines, danger of stroke and spring leg
stitch.
Adapt the drive speed to ground
conditions, especially in inclination and
curves.
Attention! Do not control the stop with
the string!
In working position switch on the oneway-working
pull-cylinder hydraulics from the tractor's seat
during the drive to lift the rotors up to bolt back (2)
on the rotor holder with the stop (1). Attention! Do
not control the stop with the string!
After crossing lower the rotors to the ground with
the oneway-working pull-cylinder hydraulics.

4. Traffic regulations

The swather is serially equipped with warning plates
and lights.

4.1 Transporting the swathe on the roads

When driving on public roads and paths
consider the local regulations for traffic
marking.

5. Maintenance and periodical overhauls

5.1 Special sefety instructions

Repair works, maintenance, periodical
overhauls, cleaning and elimination of
funtctional disturbances must be
performed with the switched off drive
and stand still engine! Remove the
ignition key!
It is forbidden to perform repair works
or maintenance on the machine in lifted
position without required support.
Redundant grease and oil soil the
environment.
When injured with splashed oil find
medical help immidiately.
Consider other safety instructions to
prevent damages and accidents.

5.2 General

To insure faultless working of the
machine and to reduce the wear out
always consider the maintenance
instructions and periodical overhauls.
This includes cleaning, greasing and
lubricating of built in parts and
components.
Screws and nuts tightening moment M
(if not stated otherwise)
A
8.8
Ø
M 5
5,9
M 6
M 8
25
49
M 10
M 12
85
M 14
135
M 16
210
M 20
425
M 24
730
M 27
1100
M 30
1450
After the first start and few hours of
working check the tightness of nuts
and screws, tighten them if needed.
Check up regulary (approx. every 50
hours)!
19
A
A = size of coil
10.9
M
(Nm)
A
8,7
10
15
36
72
125
200
310
610
1050
1550
2100
STAR
12.9
10
18
43
84
145
235
365
710
1220
1800
2450

Werbung

loading