4 Installation / Preparation for commissioning

4.1 RS485 Data transmission technology

All devices are connected in a bus structure (line). Up to 32 subscribers (master or
slaves) can be connected together in a segment.
The bus is terminated with an active bus termination at the beginning and end of each
segment. For stable operation, it must be ensured that both bus terminations are
always supplied with voltage. The bus termination can be switched in the measuring
system connector hood.
Repeaters (signal amplifiers) have to be used with more than 32 subscribers or to
expand the network scope in order to connect the various bus segments.
All cables used must be conform with the PROFIBUS specification for the following
copper data wire parameters:
Parameter
Wave impedance in Ω
Operating capacitance (pF/m)
Loop resistance (Ω/km)
Wire diameter (mm)
Wire cross-section (mm²)
The PROFIBUS transmission speed may be set between 9.6 kbit/s and 12 Mbit/s and
is automatically recognized by the measuring system. It is selected for all devices on
the bus at the time of commissioning the system.
The range is dependent on the transmission speed for cable type A:
Baud rate (kbits/s)
Range / Segment
A shielded data cable must be used to achieve high electromagnetic interference
stability. The shielding should be connected with low resistance to protective ground
using large shield clips at both ends. It is also important that the data line is routed
separate from power current carrying cables if at all possible. At data speed
≥ 1.5 Mbit/s, drop lines should be avoided under all circumstances.
To ensure safe and fault-free operation, the
-
-
-
-
In particular the EMC directive in its valid version must be observed!
Printed in the Federal Republic of Germany
11/07/2018
9.6
1200 m
PROFIBUS Planning Guideline, PNO Order no.: 8.012
PROFIBUS Assembly Guideline, PNO Order no.: 8.022
PROFIBUS Commissioning Guideline, PNO Order no.: 8.032
and the referenced Standards and PNO Documents contained in it must be
observed!
TR - ECE - BA - DGB - 0076 - 08
Cable type A
135...165 at a frequency of 3...20 MHz
30
≤ 110
> 0.64
> 0.34
19.2
93.75
187.5
1200 m
1200 m
1000 m
500
1500
12000
400 m
200 m
100 m
 TR-Electronic GmbH 2010, All Rights Reserved
Page 67 of 111

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ceh-110Ceh-80Coh-110Coh-80C h-110 serie

Inhaltsverzeichnis