Herunterladen Inhalt Inhalt Diese Seite drucken

Construction; Installation, Operation And Adjustments; Installing The Valve - Gemü 613 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

10

Construction

Optical
position
indicator
2
Construction
A
Actuator
1
Valve body
2
Diaphragm
11
Installation, operation and
adjustments
Prior to installation:
Ensure that valve body and diaphragm
G
material are appropriate and compatible
to handle the working medium.
Check the suitability prior to the
G
installation!
See chapter 6 "Technical data".
613, 618
11.1

Installing the valve

The equipment is subject to pressure!
Risk of severe injury or death!
®
Only work on depressurized plant.
G
A
Corrosive chemicals!
®
G
1
Hot plant components!
®
G
Never use the valve as a step or an aid
for climbing!
This entails the risk of slipping-off or
®
damaging the valve.
Do not exceed the maximum
permissible pressure!
Take precautionary measures to
®
avoid possible pressure surges
(water hammer).
Installation work must only be performed
G
by trained personnel.
Use appropriate protective gear as
G
specifi ed in plant operator's guidelines.
42 / 64
WARNING
WARNING
Risk of caustic burns!
Wear appropriate protective
gear when installing.
CAUTION
Risk of burns!
Only work on plant that has
cooled down.
CAUTION
CAUTION

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

618

Inhaltsverzeichnis