Commissioning

4.1

Before you start

)
To avoid injury to persons or damage to property, check...
... before the mains voltage is connected:
l
The wiring for completeness, short circuit and earth fault
l
"Emergency−off" function of the whole system
l
Motor connection (star/delta) must be adapted to output voltage of controller.
l
If you do not use a function module, ensure that the FIF cover is mounted properly (as
delivered).
l
If the internal voltage supply X3/20 of e.g. the standard I/O is used, the terminals X3/7 and
X3/39 must be jumpered.
... the most important drive parameter settings before the controller is enabled:
l
Are the drive parameters relevant for your application set correctly?
– E.g. configuration of analog and digital inputs and outputs
L
efesotomasyon.com - Lenze
Note!
l
Do not change the switch−on sequence.
In the event of an error during commissioning, please see the chapter "Fault
l
detection and elimination".