Herunterladen Inhalt Inhalt Diese Seite drucken

Handover Of System To Operator - Bwt Rondomat Rondomat Rondomatduo S Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

6 6 6 6 6
store and continue
The brine chamber is automatically filled with
drinking water (takes about 20 minutes).
Only when used as drinking water:
Only when used as drinking water:
Only when used as drinking water:
Only when used as drinking water:
Only when used as drinking water:
The Dr
The Dr
inking
inking
inking W W W W W ater Directiv
ater Directiv
ater Directiv
The Dr
The Dr
The Drinking
inking
ater Directiv
ater Directive prescr
threshold v
threshold value of 200 mg/l f
threshold v
alue of 200 mg/l for sodium.
alue of 200 mg/l f
alue of 200 mg/l f
threshold v
threshold v
alue of 200 mg/l f
threshold value has been set so low in order
threshold value has been set so low in order
threshold value has been set so low in order
threshold value has been set so low in order
threshold value has been set so low in order
to enable the water to be used for drinking
to enable the water to be used for drinking
to enable the water to be used for drinking
to enable the water to be used for drinking
to enable the water to be used for drinking
and cooking purposes by people on a low-
and cooking purposes by people on a low-
and cooking purposes by people on a low-
and cooking purposes by people on a low-
and cooking purposes by people on a low-
sodium diet.
sodium diet.
sodium diet.
sodium diet.
sodium diet.
Sodium content of partially softened water
Sodium content of partially softened water
Sodium content of partially softened water
Sodium content of partially softened water
Sodium content of partially softened water
A reduction of the drinking water hardness by 1
°dH causes a rise in the sodium content of 8.2
mg/l.
(Drinking water hardness – blended water
hardness) x 8.2 mg/l = Raising the sodium content.
Check once again that all pipe connections
Check once again that all pipe connections
Check once again that all pipe connections
Check once again that all pipe connections
Check once again that all pipe connections
are watertight.
are watertight.
are watertight.
are watertight.
are watertight.
Commissioning has been completed
Commissioning has been completed
Commissioning has been completed
Commissioning has been completed
Commissioning has been completed
The system is ready for use.

Handover of system to operator:

In the event of a delay between installation/
commissioning and handover to the operator a
manual regeneration of both exchanger columns
in succession must be carried out.
The operator must be informed about the
functioning, operation and control of the system.
Hand over installation and operating instructions
to the operator.
EN
EN
EN
EN
EN
e prescr
e prescr
ibes a
ibes a
e prescribes a
e prescr
ibes a
ibes a
or sodium.
or sodium.
or sodium. The
The
The
The
or sodium.
The
61
61
61
61
61

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis