Herunterladen Inhalt Inhalt Diese Seite drucken

syr All-in-One+ Connect Anleitung Zur Montage, Inbetriebnahme, Bedienung Und Wartung Seite 58

Vorschau ausblenden Andere Handbücher für All-in-One+ Connect:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

The isolating valve opens.
Vent the All-in-One+ Connect via the upstream and downstream draw-off valves.
Important: Do not click on "Weiter" (next) yet!
draw-off valve,
upstream
Setting for softening
Take a sample of raw water via the draw-off valve upstream
enclosed titration test (3000.00.937).
Note the value here!
Turn the blending valve towards "hard" for harder water or towards "soft" for fi llings with softer water.
Check the soft water hardness via the draw-off valve downstream
Adjust the setting of the blending valve, if necessary.
Repeat the procedure if necessary and note the set value here!
Setting for full demineralization
Take a sample of raw water via the draw-off valve upstream
enclosed titration test (3000.00.937).
Note the value here!
Turn the blending valve completely to "soft" to fi ll the system with completely demineralized water.
Check the conductivity of the water via the draw-off valve downstream
Draw off water for at least 1 min to make sure the conductivity stabilizes!
draw-off valve,
downstream
)
(page 6, item
and determine the degree of hardness with the
(page 6, item
)
.
)
(page 6, item
and determine the degree of hardness with the
)
(page 6, item
.
17

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für syr All-in-One+ Connect

Diese Anleitung auch für:

3228.15.015

Inhaltsverzeichnis