Indicate the desired target pressure up to which the heating installation is to be fi lled.
Click on "Erstbefüllung" (initial fi lling).
Set the maximum fi lling volume and duration.
Tip:
To indicate the fi lling time, the fi lling capacity of 0.5 m
must be considered for the fi lling volume!
Example:
max. fi lling volume: 500l - max. fi lling time: 1 hour
max. fi lling volume: 1000l - max. fi lling time: 2 hours
Now open the isolating valve of the connecting fl ange again.
Start the "Erstbefüllung" (initial fi lling) by pulling the slider to the right.
The All-in-One+ Connect now fi lls the installation until the set target pressure has been reached and then it switches to "automatischer
Nachfüllbetrieb" (automatic refi ll mode).
The initial commissioning is now complete!
7.4. Initial fi lling "with water conditioning"
7.4.1 Assembly of the connection set with hoses (accessories for heating water conditioning)
The connection set is available as an optional accessory for heating water treatment (order number 3228.00.001), install it according to the
following description.
Connect a hose to the front connecting piece for the water conditioning of the All-in-One+ Connect and to the connecting piece
marked "IN" of the connection set.
Connect the other hose to the connecting piece marked "OUT" and to the rear connecting piece for water conditioning of the
All-in-One+ Connect.
Assembly, commissioning, operation and maintenance