Herunterladen Diese Seite drucken

Tractel L 500 P-Serie Original-Montage- Und Betriebsanleitung Seite 16

Elektrisch angetriebene seildurchlaufwinden für drahtseile zur personenbeförderung

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and operating manual
Rope, products in contact with the rope and rigging must not
be soiled by heavily soiling building materials such as conc-
rete, epoxy resin or other adhesive materials. Protect the
products against soiling! Always use brush attachments to
clean the wire rope in an extremely dirty environment.
If sand-blasting or painting work is carried out in the vicinity
of the hoist, cover the hoists so that the effectiveness of the
brake is not impaired.
Abide by the rope's withdrawal criteria, see '15.4 Care and
maintenance, Rope' on page 20.
Clean regularly.
Check that all of the screw connections are tight.
Replace any damaged parts or have them repaired by a
specialist. Repairs are only to be carried out by a specialist
workshop or by personnel from TRACTEL Greifzug GmbH.
Never use a high pressure cleaner to clean the rope or
products in contact with the rope! Penetrating moisture will
result in malfunctions and damage to mechanical installati-
ons (e.g. brakes, ball bearings) and the electrical equipment.
Dirt on the wire rope will result in premature wear or the
corrosion of the wire rope, rigging and products in contact
with the rope.
Do not lubricate the rope using a lubricant that contains
disulfide (e.g. Molycote
).
®
You must abide by the safety specification sheets issued by
the manufacturer of the lubricant being used.
Abide by the instructions concerning transport, storage and
cleaning listed on page 18.
The anchoring devices must comply with the instructions
given in this manual or the applicable directives / standards.
The permitted working load must never be exceeded.
Motors can become hot whilst working. Never touch the
motors.
Operation without plugs on the motor (Position 3, see Fig.
14) is prohibited. Moisture can impair the effectiveness of
the brake. Risk of injury on the exposed motor shaft.
Working outdoors during lightning or a storm is prohibited.
Danger of lightning strikes or the load being tipped over by
gusts of wind.
Local climate and weather conditions must always be taken
into consideration during the planning stages: If in doubt,
you must request the weather and wind forecast from the
meteorological office before beginning work.
Maintenance and repair work must only be undertaken by
authorized service personnel, see '15.1 Authorized mainte-
nance personnel' on page 19.
Self-locking nuts must never be reused and they must al-
ways be exchanged for new ones.
Only qualified personnel who have been trained on the
system are permitted to install and operate it in compliance
with the instructions given in this instruction manual.
Private users are obliged to obtain training in the assembly,
operation and maintenance of the unit by TRACTEL
Greifzug GmbH.
EN-4
Only qualified electricians or trainees supervised by a quali-
fied electrician are permitted to undertake work on the elec-
trical equipment in accordance with the electro technical
standards, rules and regulations.
The electric connection must be implemented as described
in '9.3 Assembly, Electrical connection' on page 12 in order
to avoid electrical hazards.
Never stand beneath suspended loads. Cordon off the
dangerous area whenever necessary. Support and secure
caught or jammed loads.
Never grasp the wire rope while the machine is operating.
Never reach into the inlet or outlet of rope contacting devi-
ces whilst the machine is operating. There is a risk of being
pulled in and crushed.
Hearing protection may be necessary, depending on how
the hoist is installed.
If the load cannot be guided by on-site means then a rota-
tion-resistant wire rope with a swivel hook or a rope swivel
must be used. Swivel hook and rope swivel must turn freely
when subjected to loads.
When performing welding work the national safety and
accident prevention regulations must be observed (e.g.
BGR 159 in Germany).
2.2
Instructions for the operator
The operating company is responsible for the creation of an
emergency rescue plan and for the provision of information
concerning this to all equipment operators / supervisors.
The emergency rescue plan must be specified in writing and
kept together with this operation manual.
The operating company is responsible for training personnel
in all of the measures set out in the emergency rescue plan
under safe conditions.
If more than one person is entrusted with the tasks men-
tioned above then the operator must appoint a supervisor
who is authorized to issue instructions.
The operator is also responsible for preparing clear operat-
ing, maintenance, repair and other working instructions and
ensuring that the unit is operated correctly by instructing and
training the personnel in the correct and approved utilization
methods.
Attached warning signs and information signs must be
readable at all times. Missing or illegible warning signs and
information signs must be replaced immediately.
The operator is responsible for the correct operation of the
system as well as for adhering to the maintenance periods
and the undertaking of the service work.
A minimum weight is always required for an emergency
descent.
The operator or the system manufacturer must ensure that
the payload can be traversed against the static friction in a
manual emergency descent in any situation (e.g. if the rope
is reeved) and that the maximum working load is not excee-
ded.
G919.6 - 07/2012

Werbung

loading