Herunterladen Inhalt Inhalt Diese Seite drucken

gaskatel Test Cell ElyFlow Bedienungsanleitung Seite 43

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

You can also measure membrane resistances with this arrangement. Two reference
electrodes are then needed. One is inserted into the analyte compartment and the
second into the bore of the electrolyte compartment as usual.
3. Filling of the test cell
ElyFlow is designed to operate with electrolyte pumps. Therefore, all openings must be
closed.
Electrolyte
inlet
Electrolyte
outlet
EN - Page 17

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ptfe83400

Inhaltsverzeichnis