Herunterladen Inhalt Inhalt Diese Seite drucken

Enclosure Installation; Cleaning - GF UD2100 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating Instructions
6.4

Enclosure Installation

Locate the enclosure within 20 ft (6 m) of the sensor (500 ft -150 m optional). The enclosure can be wall mounted with the four mount-
ing screws (included) or panel mounted with Option PM Panel Mount kit from GF.
Avoid mounting the enclosure in direct sunlight to protect the electronics from damage due to overheating and condensate. In high
humidity atmospheres, or where temperatures fall below freezing,
Option TH Enclosure Heater and Thermostat is recommended. IMPORTANT: Seal conduit entries to prevent moisture from entering
enclosure.
NEMA4X (IP66) with clear cover
1. Open hinged enclosure cover.
2. Insert #12 screws (supplied) through the four enclosure
mounting holes to secure the enclosure to the wall or mounting
stand.
Additional conduit holes can be cut in the bottom of the
enclosure when required. Use a hole saw or Greenlee-type
hole cutter to cut the required holes.
DO NOT make conduit/wiring entries into the top of the
enclosure.
Note: This non-metallic enclosure does not automatically
provide grounding between conduit connections. Grounding
must be provided as part of the installation. Ground in accor-
dance with the requirements of the National Electrical Code.
System grounding is provided by connecting grounding wires
from all conduit entries to the steel mounting plate or another
point which provides continuity.
6.5

Cleaning

Cleaning is not required as a part of normal maintenance.
UD2100 Ultrasonic Doppler Flow Meter
COVER
ENCLOSURE
MOUNTING
HOLES
ENCLOSURE
END VIEW
CONDUIT ENTRY
LOCATION
SIDE VIEW
29

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis