Insert the two steel balls with a little grease into the
rack at the top and bottom. Optionally, place the bot-
tom steel ball in the lower guide.
Slide the drilling table support with the gear rack onto
the drilling column and clamp firmly.
Check that the bottom steel ball is correctly seated,
place the retaining ring on the rack and clamp it tight
with the stud bolt.
CAUTION!
Danger of tipping. Check the smooth rotation of
the drilling table and the movement on the drilling
column only when the machine foot is fixed to the floor or table.
Mount the machine foot on your surface and place the
drill head on the column.
The immersion depth of the drill head in the drill col-
umn must be at least 88 mm.
Align the drill head with the machine base and tighten
the clamping screws.
Attach and fasten the quill lever.
3.4

Installation site

Organize the working area around the drilling machine according to the local safety regulations.
INFORMATION
In order to attain good functionality and a high processing accuracy as well as a long service life
of the machine, the place of installation should fulfil certain criteria.
Please observe the following points:
The device must only be installed and operated in a dry and well-ventilated place.
Avoid places close to machines which cause chips or dust.
The installation site must be vibration-free, i.e. located away from presses, planing
machines, etc.
The substructure must be suitable for the drilling machine. Also make sure that the floor has
sufficient load bearing capacity and is level.
The ground must be prepared in a way that potential coolants cannot penetrate the floor.
Any parts sticking out such as stops, handles, etc. have to be secured by measures taken
by the customer if necessary in order to avoid endangering persons.
Provide sufficient space for the personnel preparing and operating the machine and trans-
porting the material.
Also make sure the machine is accessible for setting and maintenance works.
Provide for sufficient backlight (Minimum value: 500 lux, measured at the tool tip). At lower
illumination intensities, additional illumination has to be ensured e.g. by means of a sepa-
rate workplace lamp.
Delivery, interdepartmental transport, assembly and commissioning
Version 1.0.2 - 2022-04-06
Translation of original instructions
DP26