Herunterladen Inhalt Inhalt Diese Seite drucken

First Commissioning; Warming Up The Machine; Electrical Connection; Dq20V - 230V Protective Contact Plug - Optimum OPTidrill DQ 20V Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.5

First commissioning

CAUTION!
First commissioning may only take place after proper installation.
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTIMUM or of
the manufacturer of the clamping devices.
WARNING!
There is a danger to persons and equipment, if the first commissioning of the drilling
machine is carried out by inexperienced personnel.
We do not accept any liability for damages caused by incorrectly performed
commissioning.
3.5.1

Warming up the machine

ATTENTION!
If the drilling machine and in particular the drilling spindle is immediately operated at
maximum load when it is cold it may result in damages.
If the machine is cold, e.g. directly after having transported the machine, it should be warmed
up at a spindle speed of only 500 1/min for the first 30 minutes.
3.6

Electrical connection

3.6.1

DQ20V - 230V protective contact plug

CAUTION!
Arrange the machine's connection cable in such a way that it will not cause a tripping
hazard.
Delivery, interdepartmental transport and unpacking
Version 1.0.1 - 2021-05-11
Translation of original instruction
DQ20V
EN
55

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3191080

Inhaltsverzeichnis