Selection  of  appropriate  installation  hardware  and  its  torque  value  is  the  sole  responsibility  of  the    
NOTE:  
It  is  strongly  recommended  that  at  least  two  people  perform  the  installation.
!
The  gauge  of  the  ceiling  track  is  preset  at  the  factory.  Do  not  loosen  all  cross  struts  
simultaneously  to  avoid  altering  the  gauge  (Fig.  2).
4.1.1  
It  may  be  necessary  to  adjust  the  distance  between  cross  struts  (1/Fig.  2)  to  line  up  with    
 
the  mounting  points  determined  during  the  preplanning  process.
4.1.2  
To  do  this,  loosen  the  four  screws  (2/Fig.  2)  that  hold  each  cross  strut  in  place.
 
required  intervals.
4.1.4  
The  maximum  distance  from  the  last  attachment  point,  measured  from  the  drill  hole  center    
 
(middle  of  the  cross  strut;;  1/Fig.  2),  to  the  ceiling  track  end  must  not  exceed  275  mm  (Fig.  2).
4.1.5  
The  distance  between  the  cross  struts,  measured  from  the  center  of  the  cross  strut,  is  preset  at    
 
the  factory  at  650  mm.  This  distance  must  not  exceed  800  mm  (Fig.  2)
4.1.6  
Apply  Loctite
®
 
the  cross  struts  in  place.
!
By  factory,  these  screws  are  secured  with  Loctite  221
is  needed,  always  reapply  Loctite  221
4.1.7  
If  you  have  a  Unistrut
 
Unistrut
 rails,  as  determined  during     t he  planning  process.  Otherwise,  hold  the  track  up  and    
®
 
mark  the  drill  holes  at  the  selected  position,  and  drill  as  determined  by  the  structural  engineer.
4.1.8  
If  required,  use  the  designated  grounding  point  to  ground  the  ceiling  track  (Fig.  3  B).
4.1.9  
Lift  the  ceiling  track  and  mount  the  track  system  to  the  Unistrut
 
cross  struts  or  the  previously  drilled  installation  holes.  
4.1.10  
Mount  the  track  to  the  ceiling  with  the  selected  mounting  hardware.  Secure  the  mounting    
 
level.  Use  shims  if  necessary.
 
engineer  and  check  again  the  horizontal  positioning  using  a  block  level.
 
If  you  have  an  electrical  installation  with  a  cable  spooler,  continue  with  step  4.2.    
 
Otherwise  proceed  to  step  4.3  -­  Mounting  the  carriage  to  the  track  system.
 on  the  cleaned  screws.
®
 system  in  place,  attach  the  appropriate  installation  hardware  to  the    
®
Mounting  the  track  system  to  the  ceiling
 
 