6.2.2
Carefully, slide the canopy down the ceiling column (use caution to prevent scratches in the
NOTE:
with the set screws until the installation is complete.
the structural engineer.
personnel according to local regulations (GEF standard).
6.2.4
Ground the ceiling column with the screw marked with a grounding symbol (3/Fig. 15).
Complete the electrical connection to the clamp according to Fig. 16, when electricity is needed.
6.2.5
After completing the electrical connection, check again.
6.2.6
Once the ceiling column is installed, carefully slide the canopy upward until it rests against
the ceiling and secure it with the set screws (1/Fig. 15).
Please, proceed to 7.0, „Installation/removal of plastic covers (mounting posts)", page 22.
Installing a Portegra2 column to a ceiling
21