NOTE:
If installing the optional MAVIG isolation kit E-TS20B05,
please follow the instructions included with the kit.
Selection of appropriate installation hardware and its torque value is sole responsibility of the structural
The position of the ceiling should be determined during the project planning. For the drilling template for
Proceed with the drilling according to the template and the mounting hardware requirements set by the
structural engineer.
NOTE:
It is strongly recommended that at least two people perform the installation.
NOTE:
The Ø 8 mm hole for the safety anchor must be 3.5 mm off center.
NOTE:
Secure the chain with the attached safety latch (1/Fig. 14) to prevent it from falling into the
column tube.
the structural engineer.
6.1.2
Push up the column and engage the safety latch (1/Fig. 14) into the safety anchor (2/Fig. 14).
!
After installation, ensure the safety latch is closed to ensure the column is properly
secured.
6.1.3
Once the chain is engaged into the safety anchor (2/Fig. 14), push up the ceiling column
slightly and rotate the safety latch (1/Fig. 14), to assure the small diameter of the safety
latch being hooked into the safety anchor.
Installing a Portegra2 column to a ceiling
2
1
Fig. 14
19