Herunterladen Inhalt Inhalt Diese Seite drucken

Educt Supply & Residue Draining - Heidolph Hei-VOLUME Distimatic Pro Aufbauanleitung

Automatikmodul für rotationsverdampfer
Vorschau ausblenden Andere Handbücher für Hei-VOLUME Distimatic Pro:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly
Educt supply & residue draining
Required tube: PTFE, transparent (included, sold by the meter).
Position the educt container and the residue container in the place of use and cut
the two pieces of tube to the required lengths between the container and valve
matrix.
Fit the tube ends, which are plugged into the valve matrix, in the angle clips
supplied for this purpose (see figure, Item [1] and [2]).
Make sure that the free end of the tube protrudes from the
angle clip far enough to ensure a secure connection to the tube
connector!
Educt supply: Tube connection [1] is used to supply the system with educt. Route
the tube [1] from the educt sensor vessel into the educt container.
Residue draining: Tube connection [2] is used to drain the residue from the system.
Route the tube [2] from the residue valve into the residue container.
90

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis