Items to be checked
The gas valve and liquid valve of connection pipe are
open completely?

Test operation

1.
Preparation of test operation
• The client approves the air conditioner installation.
• Specify the important notes for air conditioner to the client.
2. Method of test operation
• Put through the power, press ON/OFF button on the remote controller to start operation.
• Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to check whether the operation is
normal or not.
• If the ambient temperature is lower than 16 , the air conditioner can't start cooling.
Installation instructions of anti-collapse chain
• In order to prevent accidental collapse of indoor unit, please install the anti-collapse chain.
1.
Remove the screw of anti-collapse hole at the top cover of indoor unit (see fig. 3).
2. Take out the anti-collapse chain and put it into the anti-collapse hole, and then tighten it with screw (see
fig. 4)
3. Fix the other end of anti-collapse chain on the wall with screw (ST4.2X38) (see fig. 4)
Remove the screw at the top cover
Fig. 3
69
Fix the other end on the wall with screw
Put this end into the hole
and then tighten it with screw
Anti-collapse hole
Possible malfunction
It may cause insufficient cooling (heating) capacity.
Fig. 4