Herunterladen Inhalt Inhalt Diese Seite drucken

Test Operation - Klarstein 10029708 Bedienungsanleitung

Klimaanlagen innengerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Items to be checked
Does the power cord follow specification?
Is there any obstruction in air inlet and air outlet?
The dust and sundries caused during installation are
removed?
The gas valve and liquid valve of connection pipe are
open completely?

Test operation

1.
Preparation of test operation
• The client approves the air conditioner installation.
• Specify the important notes for air conditioner to the client.
2. Method of test operation
• Put through the power, press ON/OFF button on the remote controller to start operation.
• Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to check whether the operation is
normal or not.
• If the ambient temperature is lower than 16 , the air conditioner cannot start cooling.
Configuration of connection pipe
1.
Standard length of connection pipe: 5, 7.5, 8 m.
2. Min. length of connection pipe is 3 m.
3. Max. length of connection pipe and max. height
difference.
Cooling capacity
Max length
of pipe
5000 Btu/h
(1465 W)
7000 Btu/h
(2051 W)
9000 Btu/h
(2637 W)
12000 Btu/h
(3516 W)
180 Btu/h
(5274 W)
Max. height
difference
15 m
5
15 m
5
15 m
5
20 m
10
25 m
10
Possible malfunction
It may cause malfunction or damage the parts.
It may cause insufficient cooling (heating).
It may cause malfunction or damage the parts.
It may cause insufficient cooling (heating) capacity.
Cooling capacity
Max length
of pipe
Btu/h
(1465 W)
7000 Btu/h
(2051 W)
9000 Btu/h
(2637 W)
12000 Btu/h
(3516 W)
180 Btu/h
(5274 W)
Max. height
difference
15 m
5
15 m
5
15 m
5
20 m
10
25 m
10
54

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

10029709

Inhaltsverzeichnis