Herunterladen Inhalt Inhalt Diese Seite drucken

Inflating The Boat - Zodiac Futura MARK 2C Bedienungsanleitung

Tome 2
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 41
NEVER PRESSURISE A
COMPARTMENT WHEN
THE OTHERS ARE
COMPLETELY DEFLATED
2-INFLATING THE HPP FLOORBAORD (if this option is selected)
1- Inflate with the lever in position A until handling becomes hard.
2-Finish inflation in position
3-INFLATING THE KEEL / DAMPING BUOYANCY MECHANISM
• Once the floor is assembled, start inflating using the bases located on the transom (pressure =
240 mb (3.48 PSI), see "PRESSURE" section).
Inflation base
Inflating is complete: fit the inflation valve caps tight.
NOTE:

INFLATING THE BOAT

1
50 %
100 %
2
B
until the recommended pressure is reached (800 mb).
A slight air leak is normal before the valve cap is screwed on.
ONLY THE VALVE CAPS CAN ENSURE FINAL AIR TIGHTNESS.
100 %
0 %
50 %
100 %
/ 10
8
a
0 %
50 %
100 %

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Futura mark 2Futura mark 3

Inhaltsverzeichnis