Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Procedure; Check On Unpacking - Zodiac Futura MARK 2C Bedienungsanleitung

Tome 2
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 41
The boat assembly procedure follows an order you must respect. Proceed step by step, referring each
time to the pages indicated for explanations.
1. Make an inventory of the parts of the boat and get to
know them.
2. Activate the valves in inflating position
3. Slightly inflate the main buoyancy tube
4. Assemble the floorboard (according to chosen option)
5. Finish inflation of the boat to the correct pressure
6. Install equipment (according to chosen option)
CAUTION
The pack must contain: 1 buoyancy tube +
ZODIAC FUTURA
Owner's manual (2 volumes)
Repair kit
Standard equipment
Paddles
Pressure gauge
Foot-pump
Bow bag
Carrying bag
You can equip your boat with many optional accessories (transportation wheels, ladder, bag under the
bench, lifting rings etc.). Ask your dealer to advise you.
NOTE:

ASSEMBLY PROCEDURE

PROCEDURE

CHECK ON UNPACKING

IF YOU WISH TO ADD LIFTING RINGS (FOR PLACING ON THE DAVIT),
YOU MUST FIX THEM ON THE BUOYANCY TUBE, NEVER ON THE
FLOOR.
PAGE
2
I - IV
6
7
3-5
7-8
9
V
DO NOT USE A SHARP TOOL
(CUTTER, KNIFE, ETC.)
MARK 2C
X
X
2
1
1
1
2
/ 10
2
SECTION
CHECK ON UNPACKING
DESCRIPTION
INFLATION SYSTEM
INFLATING THE BOAT
ASSEMBLY
INFLATING THE BOAT
PRESSION
ASSEMBLY OF EQUIPMENT
MARK 2
MARK 3
X
X
2
1
1
1
2
X
X
2
1
1
1
2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Futura mark 2Futura mark 3

Inhaltsverzeichnis