7.4
Handing over the unit to the ope-
rator
NOTE
► If there is a delay between the installa-
tion/start-up of the unit and hand over to the
operator, both exchanger columns must be
manually regenerated in succession.
► The operator must be told how the unit
works as well as how to operate and inspect
it. Ensure that the operator receives the in-
stallation and operating manual.