6
Installation
6.1
Installation diagram
Pressure reducer, and me-
tering unit may be required
depending on operating
conditions
Multiblock X
Inlet
to 6
5
6
Pressure
reducer
AQA stop
Filter
Floor
Floor
sensor
drain
Outlet
from 5
Connect the unit as shown in the adjacent
diagram.
A bypass is integrated into Multiblock X.
The unit can be installed in horizontal or vertical
pipelines.
Follow the separate installation instructions;
otherwise the warranty is void if the unit becomes
damaged.
Flush out any dirt particles by opening the hand-
wheel on the Multiblock.
Connect a corrugated hose to the Multiblock outlet
and then connect this to the hard water inlet (6).
Observe the arrow indicating the direction of flow!
Connect a corrugated hose to the Multiblock inlet
and form a watertight seal with the softened water
outlet (5).
EN
Dosing
unit
Sample cock
59
59