Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Operation; Functional And Warranty Conditions - BWT AQA perla XL Einbau- Und Bedienungsanleitung

Duplex-weichwasseranlage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
5.4

Installation

The pipeline network must be flushed before the
unit can be installed.
You must check whether a mineral metering device
needs to be installed downstream from the water
softener for the purpose of preventing corrosion.
Use corrosion-resistant pipe materials for installati-
on. Pay attention to corrosion-causing chemical pro-
perties when different pipe materials are combined
(mixed installation), even in the inflow direction
upstream of the water softener.
A protective filter must be installed in the direction
of flow no more than 1 m upstream of the unit. The
filter must be functional before the softener is ins-
talled. This is the only way to ensure that dirt and
corrosive products do not enter the water softener.
Test sample extraction points must be installed
upstream and downstream of the unit, according
to the specifications of VDI 6023.
The hose attached to the overflow point of the
regenerative container and the flushing water hose
must be routed at an incline to the sewage system
or connected to a pump.
According to EN 1717, the flushing water hose and
the overflow hose must be connected to the sewage
system at a specified distance above the highest
possible waste water level. (Distance is greater than
the diameter of the drain pipe).
If the flushing water is fed into a pump, it must be
designed for a water volume of at least 2 m
35 l/min for units for building services and at least
3 m
/h or 50 l/min for Rondomat and AQA perla XL
3
Professional units.
If the pump is used for other units simultaneously,
it must be sized larger by a factor of their water
output quantities.
The pump must be salt water resistant.
58
5.5

Operation

The performance specifications of the unit must
match the expected usage conditions. Related
information can be found in DIN 1988-200 and in
the technical specifications.
After periods in which little or no water is tapped,
e.g. during holidays, you must fully open the tap
for at least 5 minutes before you can use the water
again (see the section on stoppages in the operating
instructions).
The microbiological quality of the softened water is
also determined by the quality of the regenerative
used.
5.6
Functional and warranty condi-
tions
Water softeners and ion exchange units require
regular functional monitoring, maintenance and re-
placement of important parts after certain intervals.
The amounts of metering substance and regenera-
tive necessary are subject to the level of consumpti-
on, which depends on operating conditions.
Water softeners must be cleaned regularly and also
disinfected if necessary. See the installation and
operating instructions for the maintenance intervals.
We recommend that you enter into a maintenance
agreement.
/h or
3

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis