Herunterladen Inhalt Inhalt Diese Seite drucken

Qualifications And Activities; Description Of The Device; Features; Overview - EuroLite STC Bedienungsanleitung

Truss lifter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Improper use hazard
When leaving the truss lifter unattended with a load, secure from unauthorized use (e.g. lock the winch with
a chain etc.). Unauthorized personnel may attempt to operate the machine without proper instruction,
creating an unsafe condition.

Qualifications and activities

When using or installing truss systems, the following qualifications are required:
"Diplom" engineer
"Meister" / "Assistent" for
event technology / head
rigger / light crew chief
"Sachkundiger für Veran-
staltungs-Rigging"
"Fachkraft für
Veranstaltungstechnik"
"Veranstaltungsoperator"
Person with appropriate
briefing
Source: VPLT Codes of Practice SR 1.0 – Provision and Use of Truss Systems, 10.02.2005

DESCRIPTION OF THE DEVICE

Features

Rugged truss lifter
• Four-part telescopic lifter with galvanized steel sections
• TÜV/GS certified, certificate available
• CE certified complying with DIN EN ISO 12100-2, DIN 15560-27, certificate available
• 1-gear winch for easy lifting of the loads
• Automatic braking system
• Safety-pins for mechanic locking
• Third safety device via massive block locking
• Four massive outriggers for highest stability
• Outriggers are firmly connected with the base, the finishing is velcro-protected
• Uneven grounds can be compensated via individually adjustable levelling braces
• Four auto-levelling, galvanized foot plates
• Truss lifter can be fixed via holes in the foot plates
• Easy transport via 100 mm swivel castors
• 4 swivel castors for vertical transport, 2 with brake
• 2/4 additional castors for horizontal transport (STC-480/STC-550)
• Powder-coated base and galvanized sections for highest corrosion protection

Overview

Please refer to the illustrations on page 2-4.
(1) Adapter
(2) Fixation screw
(3) Section
(4) Safety-pin
(5) Cable
(6) Winch
(7) Winch handle
(8) Base
Planning
Structural
and
analysis
system
selection
yes
yes
yes
no
no
no
no
no
no
no
no
no
21/26
Manage-
On-site
ment and
inspection
super-
vision
yes
yes
yes
yes
no
yes
no
no
no
no
no
no
(9) Horizontal transport castor
(10) Vertical transport castor with brake
(11) Velcro
(12) Outrigger
(13) Levelling brace
(14) Foot plate
(15) Spring pin
(16) Screw handle
Attachmen
Assembly
t of truss
of trusses
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
no
yes
00037766.DOC, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis