Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli UNITRIUM Bedienungs- Und Wartungsanleitung Seite 57

Umpflanzmaschine
Vorschau ausblenden Andere Handbücher für UNITRIUM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Handling and lifting the packed unit
WARNING
Lift the packed machine using appropriate hoisting
means for the load to lift.
Check the parcel weight stated on the packing itself.
UN41-0077GF
Lifting the UNITRIUM
WARNING
During lifting watch out for the load swinging, as
the hook-up point is never perfectly at the centre of
gravity.
UN41-0529AN
Proceed as outlined below.
1) Use the specific tool (A) provided with the work vehi-
cle for lifting.
English language
SAFETY INFORMATION CONCERNING HANDLING AND
INSTALLATION
13
Authorised personnel must comply with the instructions
contained on the packing, in particular those concern-
ing security.
Handle the packed equipment slowly, with care and cau-
tion, to prevent it swinging dangerously.
The illustration shows the harnessing points and lifting
procedure.
Lifting operations must be carried out using suitable
means for the load to be lifted, by qualified and author-
ised personnel in order to safeguard their own safety
and that of the other people involved in the operations.
The illustration shows the hook-up points for lifting the
work unit with two planting units fitted.
The hook-up points for lifting apply for all the UNITRIUM
models.
2) Strap up the work vehicle as shown in the figure.
3) Check that the pin (B) is secured by the lock pin (C)
and that the chains are fastened stably to the frame
(D).
4
Use and maintenance

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis