Herunterladen Inhalt Inhalt Diese Seite drucken

Emptying The Containers; Assembling The Pump; Emptying The Pipetting Container - Mettler Toledo XPR26PC Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für XPR26PC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
Maintenance action

Emptying the containers

Cleaning
Updating the software
See also
Performing an internal adjustment   Page 14
Cleaning   Page 20
Emptying the containers   Page 18
5.2 Emptying the containers

5.2.1 Assembling the pump

During normal usage, the pipetting container and the evaporation trap container are filled with water. The pump
serves to remove the water in a safe and efficient manner, without having to disassemble the instrument. The
inlet tube has a probe attached for easier handling. The outlet tube serves to dispose of the aspirated liquid.
1 Install the cables in such a way that they cannot be
damaged or interfere with operation.
2 Insert the plug of the AC/DC adapter (1) into the power
socket.
3 Secure the plug by firmly tightening the knurled nut.
4 Insert the plug of the power cable into a grounded power
outlet that is easily accessible.
5 Connect the pump tube with the probe (2) to the nozzle
IN (3).
6 Connect the other pump tube to the nozzle OUT (4).
7 Place the free end of the tube into a container suitable for liquid waste (5).

5.2.2 Emptying the pipetting container

The pipetting container must be regularly emptied to prevent an overflow.
NOTICE
Damage to the pump due to inapropriate handling
If the pump is switched on when it is not in use, it can get damaged.
18
Recommended interval
Depending on the frequency of usage of the
instrument
Depending on your internal regulations
(SOP)
After every use
Depending on the degree of pollution
Depending on your internal regulations
(SOP)
Depending on your internal regulations
(SOP).
After a new software release.
Switch off the pump when it is not in use.
Remarks
see "Emptying the containers"
see "Cleaning"
see "Software update" in the
Reference Manual
3
2
1
Pipette Calibration Balances
4
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis