Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Operation; Connecting The Weighing Platform To The Weighing Terminal - Mettler Toledo PBA439 Serie Benutzerhandbuch

Wägebrücke
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 29

3 Installation and Operation

3.1 Connecting the Weighing Platform to the Weighing Terminal

The PBA439(x/xx) weighing platforms are designed for use with analog METTLER TOLEDO weighing terminals.
1 Insert the weighing platform cable through the cable gland into the weighing terminal.
2 Connect the weighing platform cable to the terminal strip of the weighing terminal according to the following
table.
Signal
SIG+
SIG-
EXC+
EXC-
SEN+
SEN-
The cable shield must be grounded.
Safety Precautions for Connections
When connecting the weighing platform in hazardous area, strictly follow the requirements as stated in
control drawing available in [Appendix   Page 20].
Please check the special conditions for safe use in the drawings and the certificates in [Appendix 
 Page 20].
The cable shield is connected to the load cell spring element (the body of the load cell). Please consider the
appropriate connection between load cell and terminal (or junction box) based on the installation scenario.
The resistance between all safety ground connections and the system grounding electrode must not exceed
1 ohm.
Installation shall be in accordance with relevant electrical installation standards.
Not following these instructions will jeopardize the explosion safety.
Wire Color
White
Red
Green
Black
Yellow
Blue
WARNING
Connector
6-WIRE CELLS
LOAD CELL OR JUNCTION BOX
Installation and Operation​ ​
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis