3.4
Initial start-up NS 2-20
•
Make sure that no foreign bodies or impurities are present in the grease separator.
•
Close all discharge valves <25, 27>.
•
)LOO WKH HQWLUH JUHDVH VHSDUDWRU IXOO\ ZLWK ZDWHU XS WR WKH SODQW RYHUÁRZ DW RYHUÁRZ !
•
Perform a pressure test; to do so:
• Open the Balance-Tower <30> maintenance port.
• Lock both the drainage <35> and the supply lines <16> with suitable means.
• Fill the grease separator fully
• Restore the functionality of the drainage <35> and supply lines <16>
• Check heating mantle tightness
3.4.1 Grease Separator NS 2-10
1)
Fill up to 2 cm below the maintenance opening on the Balance-Tower
Assembly
1
with water, and ensure that there are no leaks.
41
16
48
25
27
ÀJ
54 / 80
30
35