Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up Ns 2-20; Grease Separator Ns 2-10 - Kessel NS 2 Anleitung Für Einbau, Bedienung Und Wartung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.4

Initial start-up NS 2-20

Make sure that no foreign bodies or impurities are present in the grease separator.
Close all discharge valves <25, 27>.
)LOO WKH HQWLUH JUHDVH VHSDUDWRU IXOO\ ZLWK ZDWHU XS WR WKH SODQW RYHUÁRZ DW RYHUÁRZ ! 
Perform a pressure test; to do so:
• Open the Balance-Tower <30> maintenance port.
• Lock both the drainage <35> and the supply lines <16> with suitable means.
• Fill the grease separator fully
• Restore the functionality of the drainage <35> and supply lines <16>
• Check heating mantle tightness

3.4.1 Grease Separator NS 2-10

1)
Fill up to 2 cm below the maintenance opening on the Balance-Tower
Assembly
1
with water, and ensure that there are no leaks.
41
16
48
25
27
ÀJ 
54 / 80
30
35
2016/05

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Ns 4Ns 7Ns 10Ns 15Ns 20Ns 25

Inhaltsverzeichnis