Herunterladen Inhalt Inhalt Diese Seite drucken

Kessel NS 2 Anleitung Für Einbau, Bedienung Und Wartung Seite 94

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly
7HVWLQJ WKH ÁXVKLQJ SXPS ZLWK 16 
1. Flushing the outlet pipe
This is initiated automatically by the control unit.
$OWHUQDWLYHO\ WKH ÁXVKLQJ SXPS FDQ EH VWDUWHG PDQXDOO\ YLD WKH FRQWURO XQLW PDQXDO RSHUDWLRQ 
7HVWLQJ WKH ÁXVKLQJ SXPS ZLWK 16 
1. Flushing the inlet pipe
This is initiated automatically by the control unit, alternatively by means of manual operation.
The shut-off valves must be in the correct position:
- Shut-off valve inlet <81>: Open
- Shut-off valve sludge trap <82>: Closed
- Shut-off valve balance tower <83>: Open
2. Flushing the sludge trap
This must be actuated manually. Set the shut-off valves to the following positions:
Shut-off valve inlet <81>: Closed
Shut-off valve sludge trap <82>: Open
Shut-off valve balance tower <83>: Open
Now switch the pump on the control unit to manual operation for 5 minutes. Manual operation is activated by
pressing the manual operation key on the control unit.
6HOHFW WKH PHQX LWHP )OXVKLQJ SXPS DQG VHW WKH VZLWFKRQ WLPH WR  PLQ  WKHQ WKH ÁXVKLQJ SXPS LV VZLW-
ched on.
&DXWLRQ DIWHU ÁXVKLQJ WKH YDOYHV PXVW EH UHWXUQHG WR WKHLU SRVLWLRQV IRU DXWRPDWLF SLSH ÁXVKLQJ
7KH VKXWRII YDOYH EDODQFH WRZHU ! FDQ EH FORVHG IRU FOHDQLQJPDLQWHQDQFH ZRUN RQ WKH ÁXVKLQJ SXPS VR WKDW
the water level does not have to be reduced.
58 / 80
2016/05

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Ns 4Ns 7Ns 10Ns 15Ns 20Ns 25

Inhaltsverzeichnis