Handover certificate(copy for company carrying out the installation
KESSEL
The initial operation and instruction was carried out in presence of person authoried to perform the
The system operator/person authorised to perform the acceptance was informed about the obligation to
Service the product according to the enclosed operating instructions.
Initial operation and instruction were not carried out.
The client/person responsible for initial operation was handed the following components and/or product
Initial operation and instruction is being carried out by(company,address,contact,phone)
The exact coordination of the dates for initial operation/instruction is being carried out by system
operator and person responsible for initial operation.
place, date
signature of person
authorised to perform
acceptance
8 . 交 接 单
(
signature of system
operator
35
signature of company
carrying out the
installation work