Herunterladen Inhalt Inhalt Diese Seite drucken

Kessel NS 2 Anleitung Für Einbau, Bedienung Und Wartung Seite 107

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Messages on the control unit
Display
Cause
Relay actv totl
Relay has performed more than
exceed.
100,000 activations
Mixer temperature
Coil temperature switch has
sensor
triggered
Sensor error
Open circuit or short-circuit in the
heating cover temperature sensor
Heating cover
The value for the number of im-
error
mersion heaters has been set
incorrectly.
Heating cover fails to heat. Sensor
UHSRUWV QR RU LQVXIÀFLHQW WHPSHUDWXUH
LQFUHDVH GXULQJ D GHÀQHG SHULRG RI
time.
Pump
Fault
Possible cause
Pump fails to
Air in the pump chamber.
pump
Pump jams or pump chamber is
blocked.
Direction of rotation of the pump is
incorrect.
Pump is overloaded; high shares of
sludge.
Pump temperature switch is activated.
Constant formation of smell
Fault
Possible cause
Unpleasant smell
Wastewater lines are leaking.
Ventilation line is missing; cross-
section too small.
%DUUHO OLG VFUHZ FODPS RU ÀOOLQJ FRQ-
nection are leaking.
Hoses
Full barrels have been stored for too
long; the contents are fermenting.
Lifting stations
&ORVHG URRP ZLWKRXW DQ\ ÁRZ RI DLU
2016/05
Maintenance
Measure
Contact customer service and replace relay
Self-resetting during motor cooling, acknowledge error
message with alarm key; in the event of further messages
concerning temperature errors, please contact customer
service.
Heating cover is automatically switched off; check sensor
cable for open circuit or short-circuit. Acknowledge error
message with alarm key. If necessary, contact customer
service.
Correct the setting; the number of immersion heaters must
be 0.
Check heating cover and/or supply cable for open circuit or
short-circuit.
Measure
&DUU\ RXW GLVSRVDO VWHS ´5LQVLQJµ DIWHU DSSUR[  VHF-
onds, full pump output is achieved again. If necessary,
VZLWFK WKH SXPS RQ EULHÁ\ VHYHUDO WLPHV
Please inform customer service.
Attention: Allow this task to be performed only by customer
VHUYLFH RU D TXDOLÀHG HOHFWULFLDQ
Carry out disposal more frequently.
Allow the pump to cool down. Attention: Pump starts up
again independently.
Measure
&KHFN WKH ÀUP ÀW DQG VHDOV DQG UHSDLU LI QHFHVVDU\
5HWURÀW RQ VLWH
&KHFN WKH ÀUP ÀW DQG VHDOV DQG UHSDLU LI QHFHVVDU\
Check the hose clamps and tighten, if necessary.
Dispatch the barrels more frequently.
1RW VXIÀFLHQWO\ YHQWLODWHG
Create ventilation possibilities; positively driven ventilation.
71 / 80

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Ns 4Ns 7Ns 10Ns 15Ns 20Ns 25

Inhaltsverzeichnis