Herunterladen Inhalt Inhalt Diese Seite drucken

Power Supply; Connection To Dvb-S/S2/S2X; Connection To The Lnbs; Multiswitches As Input Distributors - axing SKM 40-00M Betriebsanleitung

Multituner | dvb-c/dvb-t
Vorschau ausblenden Andere Handbücher für SKM 40-00M:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation instructions | SKM 40-00M | SKM 40-04M | SKM 80-00M
2.4.

Power supply

The modules have two identical connecting sockets on the bottom for the power supply. Both are linked
together internally. One of both connecting sockets is used to get the operating voltage from the power supply
unit or from another module. The second one can be used to loop the operating voltage through to the next
module or to the output combiner of the base unit. With the DC patch cable (SKZ 40-00) included in the scope
of delivery, the modules can be connected together.
While looping the modules through, a maximum of 3 x SKM 80-00M or 4 x SKM 40-0xM can be
connected together.
It is imperative to use a power supply unit with sufficient output power for your application!
Note that the power supply unit has to supply also the LNBs and the active combiner of the
headend base units if necessary!
2.5.

Connection to DVB-S/S2/S2x

2.5.1.

Connection to the LNBs

On the SAT-IF input the headend modules have a remote supply voltage for the LNB and use DiSEqC 1.0
functionalities. Therefore, they can be connected directly to the LNB.
2.5.2.

Multiswitches as input distributors

Optionally, you can also use multiswitches as input distributors. The advantage of this solution is that you can
set both the SAT IF level and the satellite via the user interface. Changes in the list of programmmes can be
made using remote maintenance, so that it is not necessary to change or modify the input distribution on site.
2.6.

Connection to DVB-T/T2 or DVB-C

Before connecting the antenna cabel, the LNB power has to be switched off (see 3.3.2 on page 19). Active
DVB-T antennas have to be supplied by an external power supply.
The input level has to be 45-85 dBµV.
12
2020-02-23 | Technical improvements, changes in design, printing- and other errors expected.