Operation instructions | SKM 40-00M | SKM 40-04M | SKM 80-00M
2. Mounting and Installation
The headend modules can be operated either in a headend base units or stand-alone with the external power
supply unit.
Installation must be performed by authorized and skilled electricians only.
Before inserting or changing a module, pull the mains plug of the headend base unit from the socket!
Observe the operation instructions of the corresponding headend base unit!
Observe the operation instructions of the corresponding power supply unit!
The antenna system must be installed and grounded according to the DIN EN 60728-11 standard.
2.1.
Mounting and installation in a headend base unit
Observe the operating instructions of the headend basic unit.
There has to be used galvanic isolator between the output connector and antenna network in Sweden and
Norway state area.
10
2020-02-23 | Technical improvements, changes in design, printing- and other errors expected.