Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of Seal Insert Msh Basic-Mb-R3 (R2, R5) - Hauff-Technik MSH Basic-FUBO-E-R3 Montageanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MSH Basic-FUBO-E-R3 (R2, R5) with seal insert MSH
Basic-MB-R3 (R2, R5)
► Positioned and stable MSH Basic-FUBO-E-R3 (R2, R5)
mounted vertically, aligned with the batter board and
filled with sand (see fi g.: 20).
NOTE!
No sealing due to incorrect assembly!
Improper installation can result in damage.
• After connecting the pipes, check the bend
radii R ≥ 1 m.
• The installation fi xture is only for temporary fas-
tening. Only the immediate fi lling with sand up
to the level of the granular subbase gives a fi xed
positioning of the base plate implementation.
• The upper edge of the finished floor has to
be above the red marking. The basic unit can
be shortened by no more than up to the red
marking. Later reworking is not applicable if the
upper edge of the wall sleeve is aligned with the
upper edge of the fi nished fl oor.
• If it is not possible to shorten to fi nished fl oor
height for technical reasons, the wall sleeve may
protrude above the upper edge of the fi nished
fl oor by max. 50 mm.
► Concreted shell component/wall sleeve with prot-
rusion (see fi g.: 21).
Legend for fi g.: 21
1
Unfi nished fl oor

13 Installation of seal insert MSH Basic-MB-R3 (R2, R5)

Release cap nuts with threaded rods and remove with the
1
closing cover (see fi g.: 22).
Legend for fi g.: 22
1
Cap nut
2
Closing cover
3
Finished fl oor
34
Art. Nr.: 5090031112
Rev.: 01/2018-09-17
1
2
1
1
3
EN
Fig.: 20
Fig.: 21
Fig.: 22

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis